amber (amber) coating very low (yellows quickly) ratio 100:13

About the product

Epidian 601 + Z1 by Ciech (Epidian) is a coating epoxy resin for art / craft work, with a maximum working layer of 0.3 cm. The database records a 100:13 mix ratio, working time around 40 min, transparency described as amber (amber), UV resistance: very low (yellows quickly) and viscosity: high (2000-3000 mPas). Full cure is listed as 7 days (168 h), so mechanical work should be planned with a safety margin rather than only around demolding time.

Working with it

For Epidian 601 + Z1, the key is calm setup and process control. Work at a stable temperature around 18-25C; in colder conditions this resin may cure more slowly, turn cloudy or remain soft on the surface. Keep the 100:13 ratio and mix slowly but thoroughly; with this resin class, poor mixing causes problems more often than the product itself. For wood and porous substrates, apply a seal coat before the main pour. The 0.3 cm layer limit should not be treated as extra safety margin when the mass is high, the mold is closed or the workshop is warm. Use the two-cup method: after the first mix, transfer into a second cup and mix again to reduce streaks and soft spots from the cup walls.

Summary

Epidian 601 + Z1 is best treated as a product for projects where the layer limit, patient degassing and full cure time of 7 days (168 h) matter. Choose a finish according to exposure, abrasion and expected sheen. Before the final pour, make a small sample using the target wood, pigment and workshop temperature.

Database parameters

Classcoating
Ratio100:13
Demold6 h
Full cure7 days (168 h)

Working tips

Work at a stable temperature around 18-25C; in colder conditions this resin may cure more slowly, turn cloudy or remain soft on the surface.
Keep the 100:13 ratio and mix slowly but thoroughly; with this resin class, poor mixing causes problems more often than the product itself.
Use the two-cup method: after the first mix, transfer into a second cup and mix again to reduce streaks and soft spots from the cup walls.

Product FAQ

What is the maximum layer for Ciech (Epidian) Epidian 601 + Z1?

The NeuroResin database lists the maximum working layer as 0.3 cm. For larger masses, warmer workshops or closed molds, keep a safety margin.

What is the working time of Ciech (Epidian) Epidian 601 + Z1?

The listed working time is about 40 min. It depends on temperature, mixed mass and pour geometry.

When does Ciech (Epidian) Epidian 601 + Z1 reach full cure?

Full cure is listed as 7 days (168 h). Demolding may be possible earlier, around 6 h, but machining is best planned after full cure.